Changing the Expansion Joints on the Severn Bridge

Posted on 16th April 2015

"150 Ton jacks used to change the expansion joints on the Severn Bridge"

Stroke and pressure outputs from control system sent via Vodafone signal to an internet based telemetry website.

Click to view larger image

Back To Blog »
© Copyright 2025 Allen Hydraulic Engineering Ltd (Hydra Caps)